Flush Tegular Ceilings

Installation

Using a laser, or equivalent, determine ceiling level and secure perimeter trim (GT119) to the wall at 450mm maximum centres.

Cut lengths of either suspension angle (GT114) or suspension wire to suit suspension depth, ensuring sufficient length for fixing.

Setting out from the centre of the room, secure hangers at 1200mm maximum centres to the structural soffit using fixings approved by the Architect and determined by load and safety factor considerations.

The first hangers are to be no more than 450mm from the wall. Where possible, not less than half tiles should be used at perimeters. Install Main Runners at 1200mm centres using M6 or equivalent fixings to angle hangers.

Wire hangers to have a minimum of 3 turns to form a tight coil.

To achieve a 600 x 600mm module, interlock 1200mm cross tees between main runners at 600mm centres and 600mm cross tees centrally between them. Tiles can now be offered into place.

Cut perimeter tiles must be retained using wedges (GT120) spaced at 300mm maximum centres.

 
Product Selector

 

 

Legal Notice    Contact Us
© TT electronics plc 2003, © Burgess Architectural Products Ltd 2003, All Rights Reserved
Information about browser requirements